253.848.6500
img_header1

Our Equipment

img_module1

Holocene has state of the art drilling equipment.

Learn More

Newsletter Sign Up

Receive e-mail updates about new Holocene services, equipment, upcoming projects, and other news

Testimonials

“I just wanted to say thank you for doing such a great job of protecting the site and performing the well decommissioning on the Kazda property for the City of Tumwater. Since this was my first well decommissioning, it was great to work with a contractor that is professional and responsive to the situation. I especially appreciated that you placed the plastic sheeting on the site and used rubber mats for the well rig truck tires. It made for easy work on my end, without any complaints from the property owner. I have also received feedback from the property owner that the site meets his expectations for restoration. He also stated that you did a great job! I hope that we are able to work together again in the future.”
Amy Georgeson
Water Resource Specialist, City of Tumwater
Tumwater, WA

“I just wanted to say your crew did a solid piece of work out there today. They were very pleasant, accommodating and professional. I expected them to take 2 days, but they got it all done in one day. RJ ran a good crew, and everyone was happy.”
Chris V. Pitre
LG, LHG, CWRE
Coho Water Resources
Seattle, WA

“I wanted to express my appreciation for the professional job your crew did up in lone for us. Also, I would like to pass along a compliment from the business owner at the worksite, he said he was impressed by the professional attitude of your crew.”
Huckleberry Palmer, PE
Site Manager, Toxics Cleanup Program
Department of Ecology, Eastern Regional Office
Spokane, WA

“I understand we finished drilling today up at the Lynnwood Transit Center, which wraps up the current phase of field work. I want to convey my appreciation for the skill, hard work and flexibility the team has demonstrated in safely and successfully completing 65 borings (total footage of over ¾ mile) over the lasts 3 months. Drilling through the winter wasn’t choice #1 but I’m proud of our team and what we’ve accomplished. Please convey my appreciation to your crews, and I look forward to continuing field work later this year.”
Tim Bailey, PE
Geotechnical Engineer, GeoEngineers, Inc.
Redmond, WA

“I wanted to reach out and tell you that due to the awareness of your crew we experienced a Near Miss that could have had a very different outcome. Due to incorrect information, we placed a boring directly over a horizontally bored 8-inch intermediate pressure natural gas pipe. We were told that the pipe was 5.5 feet below ground surface so extended our pre-clearance to 7.5 feet in order to confirm that the borehole was clear of the 8-inch pipe. Turns out we were centered directly over the pipe. Luckily there was no damage to the pipe, after exposing it. The outcome could have been extremely dangerous to the health of all those involved. Please give my thanks to your crew for their hard work and attention to subsurface conditions.”
Brad Jackson
Project Professional, Antea® Group
Redmond, WA

“I’ve been working exclusively with Holocene Drilling for over a decade and spanning hundreds of projects. They are responsive, innovative, fair, and cognizant of our clients’ budget even when the drilling gets tough. They always get the job done. I’m not sure why you would hire someone else if Holocene is available.”
Calvin McCaughan
Landau Inc.
Olympia, WA