253.848.6500
img_header1

Our Equipment

img_module1

Holocene has state of the art drilling equipment.

Learn More

Newsletter Sign Up

Receive e-mail updates about new Holocene services, equipment, upcoming projects, and other news

Turnkey Dewatering Systems

Holocene takes a true full-service approach to each dewatering project. Our turnkey approach offers General Contractors the widest range of possible solutions and options. We partner with our clients to achieve project success in the most cost-effective manner. This is achieved by reviewing specific site hydrogeology and profiling the correct groundwater control applications by reviewing construction plans and specifications.

Turnkey Dewatering and Groundwater Control Services

  • Designed by Registered Professional Engineer/Licensed Hydrogeologist
  • Engineer or hydrogeologis-designed and professionally stamped dewatering plans
  • Drilling and/or hydraulic jetting of vacuum wellpoint systems
  • Installation, operation, and maintenance of wellpoint dewatering systems utilizing rotary and piston vacuum pumps
  • Installation, operation, and maintenance of deep wells utilizing submersible pumps and generators
  • Installation, operation and maintenance of recharge wells used to recharge potential settlement zones and aquifers
  • Decommissioning and abandonment of vacuum wellpoints and dewatering wells

 

Holocene provides continuous service by fielding a dewatering fleet crewed by highly trained technicians who monitor projects and inspect and maintain systems.

Our expertise and experience as a licensed drilling contractor with geotechnical project experience, combined with our knowledge of below- and above-ground dewatering systems and equipment, ensures the success of your next dewatering project.

Full-Service Dewatering System Installation, Operation, Maintenance, and Well Decommissioning:

  • Full-Service Turnkey Project Approach
  • Dewatering System Design by Licensed Hydrogeologist
  • Stamped Dewatering Plans
  • Mobilization/Demobilization
  • Start Cards and Permitting
  • Hydraulically Jetted 1.5”-3” Vacuum Well Points to 25’
  • 4300 Gallon Water Truck w/High Pressure Pump
  • Header System Installation & Removal
  • Weekly or Monthly Header System Fees
  • Pump System Installation & Removal
  • Weekly or Monthly Pump Fees
  • On-going System Operation & Maintenance
  • System Removal & Wellpoint Decommissioning